OPPORTUNITY
A REGION WITH UNTAPPED POTENTIAL
Despite being home to:
• 9,300+ companies across diverse industries
• One of the highest concentrations of U.S. manufacturing employment
• Multiple Fortune 500 headquarters
• Part of the St. Lawrence Seaway region (the world's 3rd largest economy)
…Southeastern Wisconsin still lacks a critical piece of commuter rail infrastructure that's holding back economic growth, workforce development, and regional competitiveness.
THE KENOSHA-RACINE-MILWAUKEE (KRM) CORRIDOR SOLUTION
The KRM Commuter Rail project will finally connect these thriving communities, unlocking tremendous value through:
• Increased property values (30% higher in areas near rail transit)
• Attraction and retention of skilled workforce (80% of young talent rank transit as a top factor in where to live)
• New development opportunities at 27 transit-oriented districts
• Enhanced connectivity to Chicago's economic powerhouse
• Reduced barriers to education and employment
• Sustainable, environmentally-friendly transportation
IMPACT BY THE NUMBERS
• 4,700 jobs created during construction phase
• $560 million economic impact during construction
• 126 permanent jobs for operations and maintenance
• 23,000 new residential units projected
• 7.6 million square feet of new retail space
• 4.7 million square feet of office space
• 71,000 jobs created through development
• $7.9 billion increase in property values
• $40 million in new tax revenue
Independent studies show that every dollar spent on the commuter rail system will generate $5-$10 in economic growth and value for the region.
Why build the KRM Commuter Rail Line?
The KRM Commuter Rail Line will provide a reliable daily transportation option for citizens to access jobs and opportunity in each of the cities at or adjacent to the station areas, along with access to Chicago. It will run for 33 miles from Milwaukee to Kenosha.
What’s the benefit for people living in the area?
Train service in this corridor will better connect Racine, Kenosha, and other communities along Lake Michigan to the larger Milwaukee-Chicago region. Restoring passenger rail in this corridor would enhance mobility and strengthen connections between Lake Michigan communities and the larger Milwaukee-Chicago region. Anticipated benefits include job growth, economic development, increased property values, and reduced traffic congestion. Additionally, improved rail access has the potential to attract new residents and businesses, contributing to long-term community growth. It could even benefit those who do not directly use the service by reducing traffic congestion.
Who is building the KRM Commuter Rail Line?
The project will be managed by Wisconsin Transit and Realty Group INC (WTRG), with the assistance of US Department of Transportation as a P3 BOO (Public Private Partnership Build Own Operate).
How is the project being funded?
The funding will be a combination of Federal Transit Administration (FTA) Capital Investment Grants (CIG) funding, Federal Railroad Administration discretionary grant funding and financing through the Build America Bureau, along with private investors. WTRG is expecting a total federal contribution of up to 80 percent share of the capital cost.
How does the KRM Rail Commuter Line relate to studies in this corridor?
Passenger rail service has long been planned and desired by the City of Racine and other communities along Lake Michigan. Previous studies conducted more than a decade ago included significant analyses and identified a recommended service design, station locations, organizational structure, and funding sources. The Project Development process of the CIG program will identify station locations, station locations, organizational structures and the sources of funding. Other studies have only emphasized the importance of the KRM Commuter Rail Line.
How is this different from the current Amtrak Hiawatha service?
Amtrak’s Hiawatha service provides daily trips between downtown Milwaukee and downtown Chicago on tracks largely owned by CPKC and Metra, with limited stops between the two cities. The Hiawatha route is located inland, and, as a result, the Hiawatha does not directly serve the major population centers located along Lake Michigan, including the Cities of Racine, Kenosha, and others in Southeastern Wisconsin, as well as Chicago’s North Shore communities. The proposed KRM line would directly serve Milwaukee, Racine, Kenosha, and communities in between on tracks east of the tracks used by the Hiawatha. The Amtrak Hiawatha corridor operates on different tracks with less frequent trips connecting Minneapolis and Chicago with no stops in either Racine or Kenosha. Further, the KRM corridor would offer 24 scheduled trips per day at a fare lower than an Amtrak ticket.
Is Metra or MARK going to be involved with this project?
The initial commuter rail line would not involve Metra nor the MARK corridor.
Will the KRM Rail Line require the purchase of property?
The commuter rail line will operate on 33 miles of existing Union Pacific freight rail track leased by WRTG. Access to platform stations will be built, grade crossings will be improved and there will be a 40-year track usage agreement to expand service.
Where will train stations be built? How will that be determined?
Station locations will be adjacent to the Union Pacific track and identified through an operational plan as well as the station area planning and land use process by each of the cities in the project corridor. There are currently nine (9) platform locations identified.
How many stations will there be?
There will be a total of nine stations built connecting the cities along Lake Michigan in each of the cities.
What kind of trains will be used?
The trainsets will be commuter rail vehicles with an engine and passenger cars that meet Federal Railroad Administration safety standards. The form of vehicle propulsion has not yet been determined.
How much will it cost to ride?
Fares have not been formally determined but are currently estimated to be in the range of $3.50 to $4.00 per trip in each direction.
When will the service start?
Current plans are to initiate commuter rail service in 2031 following completion of construction and testing of the line and systems.
Who will pay for the service? Will fares cover it?
The fares paid by the riding public and the projected revenues generated by station area development will cover the cost of operations. Fares will be set by dynamic pricing where train ticket prices rise and fall based on demand and number of sets sold.
Will there be increased transit to get people to/from trains?
The Predevelopment Phase of the CIG program will focus on improving connections between the rail corridor and local transit options to ensure seamless access for passengers. This could include adding or enhancing bus services, developing park-and-ride facilities, and coordinating schedules to align with train arrivals and departures. The goal is to create an integrated transportation network that makes it easy for people to get to and from train stations, whether they are traveling by bus, bike, car, or on foot.
How much economic growth should be expected?
It's challenging to provide a precise estimate of the economic growth that could result from implementing a potential passenger rail service at this stage in the process. However, examples from similar passenger rail systems across the nation, demonstrate that passenger rail can bring substantial economic benefits to communities. These benefits often include increased property values, higher levels of business investment, job creation, and broader regional economic development. For example, the use of Smart City and TOD (Transit Oriented Development) policies should create billions of dollars of economic development.
This document contains confidential information intended for a specific individual and purpose and is protected by law. If you are not the intended recipient, you shall delete the information. Any disclosure, copying, or distribution of this message or the taking of any action based on it, is strictly prohibited.